Degradation notebooks
The degradation notebooks document the development of the different projects’ strategies for removing TFA through degradation. They record how this strategies were designed, optimised and the experimental results obtained, but if you want to know more go to our degradation part in wet lab.
Evolution of dehalogenating enzymes driven by TFA toxicity (Emiel)
Week 1 (11-15 May)
Aim: Safety tour for lab work
Protocols/Methods: Safety tour
Observations/results: Able to work safely on the lab
Week 2 (18-22 May)
Aim: Design gblock 1Y37 pSEVA241
Protocols/Methods: Snapgene
Observations/results: Construct designed; gBlock ordered
Week 3 (25-29 May)
Aim: Make media LB and M9
Protocols/Methods: Media preparation
Observations/results: LB and M9 prepared
Week 4 (1-5 June)
Aim: Make LB plates, culture mutaT7 machinery, add lactose to M9
Protocols/Methods: Agar plate preparation; Qubit assay
Observations/results: Ampicillin and spectinomycin plates poured. Machinery minipreps at 58.6 ng/L (mutaT7) and 30.9 ng/L (mutaT7 fixed)
Week 5 (8-12 June)
Aim: Gibson assembly 1Y37 into pSEVA241 and transform into DH10B
Protocols/Methods: Heatshock, PCR, DpnI digestion
Observations/results: PCR failed
Week 6 (15-19 June)
Aim: Make PSI media and chemically competent NEBexpress BL21
Protocols/Methods: Media preparation; PCR; gel electrophoresis; gel purification; Gibson assembly; heatshock; miniprep
Observations/results: Redo PCR week 5. Second attempt failed. amplification succeeded with new primers, purified product, assembled and transformed into DH10B
Week 7 (22-26 June)
Aim: Transform NEBexpress BL21 with machinery and 1Y37
Protocols/Methods: Heatshock
Observations/results: Colonies obtained
Week 8 (29 June-3 July)
Aim: Purify 1Y37-pSEVA241 from colonies and sequence
Protocols/Methods: Miniprep, colony PCR
Observations/results: Purification succes with high yield, colony PCR failed
Week 9 (6-10 July)
Aim: Growth curves on TFA and acetate with LB medium
Protocols/Methods: Growth assay
Observations/results: No results recorded
Week 10 (13-17 July)
Aim: Attempted sequence of insert in pSEVA241, Growth curves on TFA and acetate with LB medium
Protocols/Methods: PCR, Sanger sequencing, growth assay
Observations/results: High variation on growth curves
Week 11 (20-24 July)
Aim: Repeated PCR with TM range, electroporation 1Y37-pSEVA241 into machinery strain
Protocols/Methods: PCR, heatshock
Observations/results: Failed. Parallel transformations with the fixed- and non-fixed-RBS machinery plasmids; no colonies from the fixed-RBS attempt
Week 12 (27-31 July)
Aim: electroporation 1Y37-pSEVA241 into machinery strain
Protocols/Methods: Heatshock, performed in duplicate
Observations/results: failed, dropped NEBexpress
Week 13 (3-7 August)
Aim: Re-amplify 1Y37 insert and mutaT7 machinery fragment over a TM range
Protocols/Methods: Gradient PCR
Observations/results: No results recorded
Week 14 (10-14 August)
Aim: Holidays
Protocols/Methods:
Observations/results:
Week 15 (17-21 August)
Aim: Electroporation repeated from previous week
Protocols/Methods: Electroporation, colony PCR
Observations/results: Transformation repeated, again no colonies. Colony PCR on non-fixed machinery succeeded
Week 16 (24-28 August)
Aim: Started cloning 1Y37 in pSEVA241 from scratch and transform
Protocols/Methods: Gibson assembly and PCR, heatshock
Observations/results: Cloning and PCR yielded product, transformation yielded colonies
Week 17 (31 August-4 September)
Aim: Transformed into strain containing machinery. Sequenced 1Y37
Protocols/Methods: Electroporation, PCR, colony PCR, Sanger sequencing
Observations/results: 1/2 plates yielded colonies.
Week 18 (7-11 September)
Aim: Redone transformation with other strain, colony PCR transformed strain
Protocols/Methods: Elektroporation, colony PCR, heatshock, Sanger sequencing
Observations/results: Success on colony. PCR 1Y37 all contained point mutations. Least significant used in future work. Three colonies sequenced
Week 19 (14-18 September)
Aim: Find toxic concentrations on TFA in M9 with 20mM gluocose and glycerol
Protocols/Methods: Growth assay, M9 preparation, electroporation
Observations/results: No toxic effect found in 25mM. Machinery into C1 glyoxylate auxotroph successful for 1/2 plasmids
Week 20 (21-25 September)
Aim: Hyperevolution with higher TFA concentrations in M9 with 20mM gluocose and glycerol
Protocols/Methods: Growth assay
Observations/results: Toxic effect found with reduced growth at 200mM and higher
Week 21 (28 September-2 October)
Aim: Analyse growth curves, out of lab - Hyperevolution with higher TFA concentrations, 200mM
Protocols/Methods: Growth curve analysis
Observations/results: Hyperevolution continued at 200mM
Week 22 (5-9 October)
Aim: Wiki writing
Protocols/Methods: N.A.
Observations/results: N.A.
Evolving Fluoroacetate Dehalogenase for TFA Defluorination via Auxotrophic Selection (Aaliyah)
Week 2-3 (18-29 May)
Aim: Design expression platforms for H1ML, DAR3835 and OxdC.
Protocols/Methods: Literature research and in silico design via SnapGene and De Novo DNA.
Observations/results: Platforms designed; required primers and gBlocks ordered.
Week 4-5 (1-12 June)
Aim: Assemble the expression platforms for H1ML, DAR3835 and OxdC.
Protocols/Methods: Gibson assembly; heat-shock transformation (E. coli); PCR; sequencing.
Observations/results: Constructs generated. Cloning round had to be repeated for the OxdC expression plasmid.
Week 6 (15-19 June)
Aim: Transform OxdC into the formate auxotrophs C1S and C1GS.
Protocols/Methods: Miniprep; electroporation (E. coli); PCR.
Observations/results: Successful.
Week 7 (22-26 June)
Aim: Introduce a His104Asn substitution in the H1ML gene (now H1NML) for improved DFA activity, following discussion with Clemens Mayer.
Protocols/Methods: PCR; gel extraction; heat-shock transformation (E. coli); Sanger sequencing.
Observations/results: Mutation successfully introduced (confirmed the following week) and transformed back into DH10 cells.
Week 8 (29 June-3 July)
Aim: Evaluate whether the oxalate auxotrophs work.
Protocols/Methods: Growth assay; M9 media preparation.
Observations/results: No observable growth at pH 7. To be followed up at lower pH.
Week 9 (6-17 July)
No lab work (holiday)
Week 11 (20-24 July)
Aim: Pre-diversify the FAcDs before evolution with MOSAIC.
Protocols/Methods: Electroporation (E. coli); sequencing (Plasmidsaurus).
Observations/results: No mutations at the targeted sites; instead, the antibiotic marker from the FAcD backbone had recombined onto the pORTMAGE. Pre-evolution diversification was not reattempted, for the sake of time.
Week 12 (27-31 July)
Aim: Assemble the FAcDs onto a BAC as an alternative hypermutation route.
Protocols/Methods: Golden Gate assembly; PCR; heat-shock transformation (E. coli).
Observations/results: Assembly successful for H1NML and DAR3835, but not for 1Y37.
Week 13 (3-7 August)
Aim: Evaluate whether the oxalate auxotrophs work at lower pH.
Protocols/Methods: Growth assay; plate reader.
Observations/results: Growth observed at lower pH under both inducible systems, at 12 mM and 20 mM oxalate. However, some larger cultures turned pink/brown when induced with DHBA.
Week 14 (10-14 August)
Aim: Transform both FAcD expression variants into the glyoxylate and oxalate auxotrophs.
Protocols/Methods: Electroporation (E. coli); PCR.
Observations/results: Transformation into the auxotrophs appeared successful.
Week 15 (17-21 August)
Aim: Transform the FAcD-containing auxotrophs with the MutaT7 machinery plasmid.
Protocols/Methods: Electroporation (E. coli); PCR; sequencing (Plasmidsaurus).
Observations/results: PCRs appeared positive, but sequencing indicated that an incorrect plasmid had been introduced.
Week 16 (24-28 August)
Aim: Determine the extent of the contamination.
Protocols/Methods: PCR.
Observations/results: Contamination extensive; work to be repeated.
Week 17 (31 August-4 September)
Aim: Transform the FAcD plasmids and the MutaT7 machinery plasmid into the auxotrophic strains.
Protocols/Methods: Electroporation (E. coli); PCR; sequencing (Plasmidsaurus).
Observations/results: Contamination again, but by a different plasmid. The auxotrophic strains themselves were confirmed correct. Work to be repeated.
Week 18 (7-11 September)
Aim: Transform the FAcD plasmids and the MutaT7 machinery plasmid into the auxotrophic strains.
Protocols/Methods: Electroporation (E. coli); PCR; sequencing (Plasmidsaurus).
Observations/results: Successful transformation of the FAcDs in pSEVA241 and of the BAC into the C1-Gly glyoxylate auxotroph. Only the BAC carrying DAR3835 transformed successfully into the C1S + pAJM336 oxalate auxotroph with IPTG induction. These were subsequently transformed with the MutaT7 machinery plasmid.
Week 19 (14-18 September)
Aim: Determine whether DFA is toxic below 20 mM, and whether the potential DFA auxotrophs can sustain growth on DFA.
Protocols/Methods: Growth assays; M9 media preparation.
Observations/results: No detrimental growth inhibition up to 20 mM DFA. DAR3835 and H1NML on pSEVA241 (mid/high copy number) both grew on DFA at 20 mM; only H1NML grew at 10 mM. Neither DAR3835 nor H1NML on the BAC grew on DFA up to 20 mM. Higher concentrations not yet tested, due to time.
Week 20-22 (21 September-8 October)
Aim: Complete auxotrophic selective hyper-evolution.
Protocols/Methods: Hyper-evolution with MutaT7; M9 agar preparation; defluorination assay; sequencing.
Observations/results: In the wet lab section.
Defluorinating enzyme screening, wide enzyme screening and photocatalytic particles for degradation (David)
Week 1 (11-15 May)
Aim: Finding potential degradation enzymes
Protocols/Methods: Literature study
Observations/results: Made a list of 6 enzymes
Week 2 (18-22 May)
Aim: Finding potential degradation enzymes
Protocols/Methods: Literature study
Observations/results: Made a list of 6 enzymes and investigated potential usage of photocatalysts.
Week 3 (25-29 May)
Aim: Cloning/assemble plasmids
Protocols/Methods: Design of CDs for GG compatibility and ordering
Observations/results: Ordered compatible sequences.
Week 4 (1-5 June)
Aim: Cloning/assemble plasmids
Protocols/Methods: Cloning, Sequencing
Observations/results: Many plasmids have some small point mutations.
Week 5 (8-12 June)
Aim: Finding mutations in the plasmids and investigating photocatalysts
Protocols/Methods: Oligos with correct sequence ordered for PCR. Made photocatalysts.
Observations/results: Synthesis of particles was succesful.
Week 6 (15-19 June)
Aim: Finding mutations in the plasmids and investigating photocatalysts
Protocols/Methods: Oligos with correct sequence ordered for PCR. Made photocatalysts.
Observations/results: Synthesis of particles was succesful.
Week 7 (22-26 June)
Aim: Finding mutations in the plasmids and investigating photocatalysts
Protocols/Methods: Oligos with correct sequence ordered for PCR. Made photocatalysts.
Observations/results: Synthesis of particles was succesful.
Week 8 (29 June-3 July)
Aim: Fixing mutations in the plasmids
Protocols/Methods: PCR
Observations/results: Four out of six plasmids correct in the end. Mutations still there are accepted.
Week 9 (6-10 July)
Aim: Fixing mutations in the plasmids and fluoride assay testing
Protocols/Methods: Testing in cuvettes
Observations/results: Succesful first fluoride test results and out of six plasmids four correct in the end. Mutations still there are accepted.
Week 10 (13-17 July)
Aim: Fluoride assay testing and transformation into MG1655. Incubate succesful transformation in TFA.
Protocols/Methods: Testing in cuvettes. Electroporation. Incubation in M9 and TFA.
Observations/results: Colour change observed. Succesful transformations
Week 11 (20-24 July)
Aim: Have fun!
Protocols/Methods: Holiday
Observations/results: Well rested
Week 12 (27-31 July)
Aim: Have fun!
Protocols/Methods: Holiday
Observations/results: Well rested
Week 13 (3-7 August)
Aim: Have fun!
Protocols/Methods: Holiday
Observations/results: Well rested
Week 14 (10-14 August)
Aim: Measuring incubated samples
Protocols/Methods: Optimalisation experiments fluoride assay protocol. Trying to make M9 somewhat functional.
Observations/results: Incubated samples in M9 interfered too much.
Week 15 (17-21 August)
Aim: Fluoride assay optimised
Protocols/Methods: Demi water testing
Observations/results: Water works
Week 16 (24-28 August)
Aim: Fluoride assay optimised
Protocols/Methods: Interference mapping
Observations/results: Minor interferences by incubation. Interference by PFAS.
Week 17 (31 August-4 September)
Aim: Fluoride assay optimised
Protocols/Methods: Testing different media, optimise data analysis, testing real enzymes
Observations/results: Measuring of fluoride works and quantifiable
Week 18 (7-11 September)
Aim: Fluoride assay optimised
Protocols/Methods: Testing different media, optimise data analysis, testing real enzymes
Observations/results: Measuring of fluoride works and quantifiable
Week 19 (14-18 September)
Aim: Fluoride assay optimised
Protocols/Methods: Testing different media, optimise data analysis, testing real enzymes
Observations/results: Measuring of fluoride works and quantifyable
Week 20 (21-25 September)
Aim: Evolution fluoride quantification
Protocols/Methods: Testing different media, optimise data analysis, testing real enzymes. Measuring enzyme activity
Observations/results: Measuring of fluoride works and quantifiable
Week 21 (28 September-2 October)
Aim: Evolution fluoride quantification
Protocols/Methods: Measuring enzyme activity
Observations/results: Measuring of fluoride works and quantifiable
Week 22 (5-9 October)
Aim: Evolution fluoride quantification
Protocols/Methods: Measuring enzyme activity
Observations/results: Potentially results for TFA
