The techno-economic model serves to simulate the potential cost and return on investment of our complete project at industrial scale. It is built upon a central mass balance (which also feeds into the life cycle assessment) based on both engineering assumptions and real-world costs.
The model itself serves two purposes:
It must influence the overall project design. Considering the enzyme kinetic model available to us, this is most achievable for the production of the enzyme(s) through impurity prediction and assessment. This part of the model is localised and requires significantly less information than the rest of the techno-economic model, and as such can be considered largely separate.
It produces data that proves that this project is an opportunity we can’t afford to miss. This was proposed individually by a range of stakeholders: Dr Jay Burt, Professor Louis Grandjean, Dr Anne Woolridge, Professor Laurence Lovat, Dr Sophie Fridman, and Alex Senechal. In combination with the life cycle assessment, our techno-economic model produces a cost per unit of environmental benefit. This unit can then be given an approximate value in savings made as a result of helping the environment, allowing the model to simulate revenue to calculate a rate of return.