ENGAGEMENT / SUSTAINABILITY

Sustainability

A reusable, protein-based scaffold for enzymes, mapped to three UN Sustainable Development Goals: clean water, cleaner industry and less waste.

Mapping reGELerate to the SDGs

Our team’s hydrogel supports progress toward the UN Sustainable Development Goals on Clean Water and Sanitation (6), Industry, Innovation and Infrastructure (9), and Responsible Consumption and Production (12). It is important to map our project to these goals because it connects a laboratory-scale material to real environmental and industrial problems, and gives us a way to judge our design by its intended outcomes beyond the lab.

Our three goals

Environmental Impact Assessment Framework

Each stage of the DBTL cycle involves a degree of exposure and interaction with the environment that may bear short-term and long-term consequences. Designing a product, assembling the sum of its parts, testing its function and scaling it into a real-world product consumes energy and materials and, in some cases, may carry a risk associated with its release. As such, the European Union’s Environmental Impact Assessment (EIA) Directive, a legislative act of the European Union that sets mandatory results to be achieved by member states, requires that ‘the effects of certain public and private projects on the environment’ are assessed before projects are approved. The EU Directive sets out an EIA framework to screen for such effects, leaving it up to individual countries to decide how to implement their screening strategies and results into national law. The primary aim of an EIA is to protect the environment by making sure that a local planning authority (LPA) is fully informed of the likely significant impacts of a project when deciding whether to grant planning permission for it. A secondary aim is to offer opportunities for the public to take part in decision-making processes. At the stage of the iGEM competition, teams are encouraged to identify environmental risks associated with their projects, but most will not require an EIA, at least until their enterprise is built and requires larger-scale infrastructure. We have therefore adapted this framework to enable teams to navigate environmental considerations that must be made at the initial stages of project development, all the way until scale-up.

Our full assessment framework and its five key stages, including how it applies to reGELerate, can be found below!

From screening to decision-making

EIA timeline

Working through the framework

What is an EIA?
An EIA is a process used to predict the environmental effects of a proposed development before a decision is made on its approval, so that harmful effects can be avoided, reduced or offset. This document is then submitted to the LPA with the project planning application. In England, planning EIAs are governed by the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. Wales, Scotland and Northern Ireland have separate regulations. Nonetheless, these regulations integrate the EU’s EIA directive, which continues to influence UK law despite Brexit in 2020. Environmental Outcomes Reports are being developed under the Levelling-up and Regeneration Act 2023. Teams should check the current implementation timetable and applicable assessment regime before making a planning application.
Who requires an EIA?
It is important to note that not all projects require an EIA - this is dependent on the type, scale and location advanced by the project developers (proponents). These regulations classify projects into 2 ‘schedules’.

EIA who

Benefits of an EIA
Beyond legal compliance, an EIA offers the benefits of increased transparency and accountability, improved communication between stakeholders and better brand recognition. As climate change continues places growing pressures on ecosystems and global health, more than 190 countries and major global economies now operate under some form of EIA in order to build environmental protection into the design of business models and other public projects.
The Five Stages of an EIA
This EIA can be subdivided into five categories that ensure that all potential predicaments arising from a project are assessed thoroughly before and after a project is built. Whilst the proponent will lead the work, the Environmental Statement is usually prepared with the help of expert environmental consultants who possess the tools to measure how a project interacts with its surroundings. The process begins with screening, a preliminary check on whether a proposed project is covered by current regulations and standards. Proponents must gauge how likely significant environmental impacts might be and how closely the different phases of the project, and the project as a whole, should be monitored. The LPA can be asked for a ‘screening opinion’ to clarify whether the project requires an EIA. If an EIA is deemed necessary, the next step is scoping. This delineates which issues must be addressed in the Environmental Statement (for example air quality, biodiversity or water management) and the methodology for conducting the assessment. Here too, the LPA can be asked for a ‘scoping opinion’ under the EIA Directive to clarify what to include.

EIA stages

Our Guidance

source based on our project, rather than a determination of your project’s regulatory status. Check the applicable jurisdiction, substance exemptions and current requirements with the relevant authorities.

Assessing your Environmental Impact during iGEM — reGELerate (PDF, 6 pages)

Contact