NOTEBOOK · 2026 PROJECT CHRONICLE

Notebook

A dated record of our work, decisions and next steps.

Explore the same project records in Calendar, Timeline or Gantt. Filter by workstream, date or status to follow the work that matters to you.

Dated records connect laboratory work, hardware development, modeling and team activities. Times use Taipei time (UTC+08:00).

01 · Calendar

Explore the chronicle

Filters Workstream · substream · status · month · search

  • Completed
  • Planned
  • iGEM official

Calendar

Calendar days through 20 October show completed team work. From 21 October, planned dates remain visible. Timeline and Gantt retain each full period’s status.

2026

September

Records matching filters: —

Read the complete chronological record

The calendar and reading record share one dataset. The team confirmed completion of project records ending before 21 October 2026, including unsuccessful attempts. Later and undated records retain their status. Session times use Taipei time (UTC+08:00); overlaps and missing evidence are preserved.

  1. team ·

    Recruit Team Members

    Team recruitment: 19 March–6 April.

    Reported calendar duration: 3 weeks. Reported actual time worked: 1 week.

    Team attributions

  2. drylab ·

    Establishing the Project Direction and Team Assignments

    Selected a fly-inspired PN → KC → MBON network for gas classification and sensor-drift studies.

    No concrete data yet; the modeling team settled on the direction: a fly-inspired SNN for gas classification, emphasizing robustness to sensor drift (architecture following Caron et al., 2013).

    Model page

  3. wetlab ·

    Project Ideation and Receptor Panel Selection

    Defined a HEK293 receptor panel with Orco and a calcium reporter.

  4. wetlab ·

    Literature Review and System Design

    Adopted insect OR–Orco ion-channel assay architecture in HEK293 with a nine-OR panel, following Zboray et al. (2023) as reference platform.

    Design · Module 2 / topology · Parts page

  5. drylab ·

    Project Ideation and Team Formation

    Established AeroSense direction and defined hardware as the fluorescence-to-digital measurement bridge.

  6. team ·

    Development of Project Plan

    Project planning: 13 April–11 May.

    Reported calendar duration: 4 weeks. Reported actual time worked: 2 weeks.

    Team attributions

  7. wetlab ·

    TH-associated light-sheet work

    The team update records TH-associated light-sheet work. The supplied 696-stack acquisition has a separate instrument-dated entry.

    Fly imaging methods · Instrument acquisition record

  8. drylab ·

    Literature Review and Hardware Requirements

    Reviewed fluorescence readout architectures and defined LED → sample → photodiode → TIA → ADC → MCU with major measurement risks.

  9. drylab ·

    Getting Familiar with the Inherited Code and Data

    Confirmed Brian2/original SNN could run in the new environment; noted dataset naming issues and suspected contamination.

    Confirmed the new environment could get Brian2 installed and run the original SNN; no new experimental data yet.

    Model page

  10. wetlab ·

    Engineering Cycle 0 — Vector Rescue

    Moved constructs to pcDNA3.1(+) to supply the mammalian promoter and poly(A) elements.

    Consolidate all constructs onto pcDNA3.1(+), which supplies a CMV promoter, BGH poly(A) and a NeoR cassette for G418 selection.

    Engineering · Wet lab track · Design · shared backbone

  11. wetlab ·

    GH146 imaging preparation

    Prepared the GH146 × UAS-GCaMP6f imaging experiment.

    Fly preparation

  12. drylab ·

    Airflow and Optical Simulations

    The hardware timeline records the airflow and optics simulation phase.

    Hardware evidence and design files · Model methods and assumptions

  13. drylab ·

    Component Selection and First-Order Calculations

    Converged on LED/PD/TIA/ADC/reference/ESP32 candidates; selected 100 MΩ as initial TIA feedback working point.

    Selected 100 MΩ as the initial TIA feedback-resistor working point, retaining the principle that final gain should be decided experimentally.

  14. drylab ·

    Data pipeline audit

    Verified inherited scripts; documented PC3×20 oracle ~0.85 F1 and SVM/ELM ~0.83; early SNN MBON readout only 0.34–0.55 F1.

    Early versions of the PN-KC-MBON architecture had unstable MBON readout (F1 only 0.34–0.55), far below the SVM/ELM baselines — suggesting the bottleneck was in the SNN's coding/readout rather than a lack of information in the data itself.

    Under the PC3×20 digitized representation, the theoretical-oracle macro F1 is about 0.85, with SVM/ELM baselines around 0.83.

    Model page · Engineering · Dry lab track

  15. drylab ·

    PCB V1 Schematic and Footprint Development

    Integrated the V1 signal chain in KiCad, including symbols/footprints and initial Raspberry Pi integration.

    Engineering · Hardware Cycle 1 · Hardware page

  16. drylab ·

    PCB V1 Design and Planning — Phase Window

    The team reports the overall PCB V1 design and planning period.

    Hardware evidence and design files

  17. drylab ·

    Establishing Baselines: SVM/DAELM + Initial Fly-SNN Sweeps

    DAELM improved batch accuracies; best early fly-SNN single-run F1 ~0.545 with unstable non-monotonic learning curves.

    DAELM calibration: one batch's known-class accuracy rose from 0.741 (source-only) to 0.867 (DAELM); another batch rose from 0.567 to 0.603. Fly-SNN best single-run F1 was about 0.545 (KC=1000, IP=0, p=0.05, Wpn=450, Wmbon=15, lr=0.05, 200 cycles), but the checkpoint curve was non-monotonic — learning was unstable.

    Model · evidence baseline · Experiments · EXP-AS-07

  18. drylab ·

    PCB V1 Layout — ERC/DRC Evaluation

    Completed four-layer V1 layout; ERC/DRC found 73 DRC violations, 4 unconnected items, 7 ERC errors, 11 ERC warnings.

    V1 review found 73 DRC violations, 4 unconnected items, 7 ERC errors and 11 ERC warnings. The board was held for revision.

    Engineering · Hardware Cycle 1 · Hardware page

  19. wetlab ·

    Engineering Cycle 2 — Redesign as a Translational Fusion

    Redesigned the reporter as GCaMP6f–(GGGGS)₃–DmOrco and checked ten construct sequences before synthesis.

    Engineering · Wet Lab Cycle 3 · Design · Module 2 · Parts page

  20. wetlab ·

    DNA electrophoresis · ORCO, Or67b

    DNA gel with 4 sample lanes for ORCO, Or67b.

    Lanes left to right: 1: 1 kb ladder, 2: ORCO_1, 3: ORCO_2, 4: Or67b_1, 5: Or67b_2.

    Pixel-identical gel image (WebP) · Results · annotated DNA gels

    The team confirmed undigested plasmids and the same 1 kb ladder in all four gels; the ladder brand and product are unavailable. Paired sample lanes share one construct label in the Results figure.

  21. hp ·

    Learning Game: Ideas and Rules

    Defined the web game idea and rules.

    Education · Learning platform

  22. hp ·

    Learning Game: Initial Design

    Prepared the initial web game design.

    Education · Learning platform

  23. hp ·

    Learning Game: Internal Evaluation and Suggestions

    Conducted internal evaluation and gathered suggestions for the web game.

    Education · Learning platform

  24. drylab ·

    Data Cleaning, Hyperparameter Breakthrough, Sensor/Precision Analysis, Repo Reorganization

    Contaminated rows removed (9726→8421); denser PN→KC + weaker lateral inhibition reached F1 0.800 (pca-3); documented baseline F1 0.868 under stated settings.

    Baseline setting: PCA-8, p=0.05, ip=2, KC=1000, lateral=2000, lr=0.025 → Precision 0.877 / Recall 0.872 / F1 0.868.

    Model · evidence baseline · Model page

  25. drylab ·

    Preparing for Professional PCB Review

    Contacted iST Group and prepared the KiCad/BOM/ERC-DRC package for external schematic and layout review.

    Attributions · iST Group · Engineering · Professional review

  26. drylab ·

    PCB V1 Assessment — Engineering Cycle 1 Phase

    Evaluated the V1 PCB through ERC/DRC checks.

    Hardware evidence and design files

  27. wetlab ·

    Plasmid Synthesis Ordered

    Ordered ten GenScript plasmids (nine OR modules + one Orco–GCaMP6f reporter) in pcDNA3.1(+).

  28. hp ·

    Public survey

    The 28-response diagnostic record informed food-decision teaching.

    Use the responses to shape clearer education and claim boundaries.

    IHP · survey evidence

  29. hp ·

    FITI business-plan review

    Mentors challenged the general-purpose electronic-nose pitch; the proposed agricultural beachhead narrowed to banana disease detection.

    Define a more specific first use case and buyer question.

    IHP · FITI feedback

  30. drylab ·

    Engineering Cycle 1: Professional Review

    Professional review and internal re-evaluation identified correction needs across TIA/guard, ADC, reference, and ESP32 control paths.

    Engineering · Hardware Cycle 1 · Engineering · Professional review

  31. drylab ·

    PCB V2 Revision and Design — Engineering Cycle 2 Phase

    The team reports the PCB V2 revision and design window.

    Hardware evidence and design files

  32. drylab ·

    Engineering Cycle 2: System Simplification and PCB V2

    Completed the ESP32-standalone power and I/O redesign.

    Reduce hardware complexity instead of adding more computation to the reader.

    Engineering · Hardware Cycle 2 · Hardware page

  33. hp ·

    Learning Game: Updates and Outcomes

    Updated the web game following the internal review.

    Education · Learning platform

  34. drylab ·

    Pipeline Cleanup, Baseline Confirmation, New Optimization/Validation Methods

    Completed the September pipeline cleanup with F1 = 0.868 as the documented reference setting.

    Model · limitations · Model · drift robustness

  35. drylab / hardware · planned ·

    Electrical Bring-Up

    Planned rail, ESP32, ADC, LED, and current-consumption bring-up tests after assembly.

    Planned tests: 5 V rail; digital 3.3 V rail; analog 3.3 V rail; 2.5 V reference; ESP32 startup; ADC communication; LED switching; current consumption.

    Pending output: Voltage table · Power-consumption table · Oscilloscope/logic-analyzer evidence

    Record provenance: Source heading 'Late September–October' — preserved as month-bounded range 2026-09 to 2026-10.

    Engineering · Validation ladder

  36. wetlab ·

    Bacterial Transformation and Plasmid Preparation

    Performed bacterial transformation and plasmid preparation.

    Experiments · EXP-AS-01 · Notebook slot nb-EXP-AS-01

  37. wetlab · planned ·

    Transfection and Stable Line Generation

    Planned G418 kill curve, OR:Orco co-transfection by electroporation, and stable-pool selection.

    Planned work: kill curve on untransfected HEK293 (0–800 µg/mL G418); co-transfection by electroporation, ~5 µg DNA at 2:1 OR : Orco per reaction; G418 selection from 24–48 h post-transfection: 100 µg/mL for two weeks, then 150 µg/mL for one week; untransfected control well at the same dose. Expected timeline noted in source: no visible effect for 1–2 days, bulk cell death at days 3–5, discrete resistant colonies by days 10–14.

    Pending output: Kill-curve table · Transfection efficiency (mCherry-positive fraction) · Stable pools for each of the nine receptors

    Record provenance: Original broad protocol/planning record retained. The 12 October team update adds dated execution sessions separately; those sessions do not confirm every reagent, dose, method or validation step in this older proposal.

    Experiments · EXP-AS-02 · Notebook slot nb-EXP-AS-02

  38. drylab ·

    V2 Schematic Correction and PCB Layout

    Completed the V2 PCB layout on 11 September.

    Engineering · Hardware Cycle 2 · Hardware page

  39. wetlab ·

    Plasmids Received

    Received ten synthesized constructs on 4 September.

  40. hp ·

    FITI pitch review

    The second FITI review focused the business case on customer loss, buyer identity and the banana application.

    IHP · FITI feedback

  41. team ·

    Building the Team Wiki

    Wiki development from 7 September to 20 October is confirmed complete.

    Reported calendar duration: 6 weeks. Reported actual time worked: 4 weeks.

    Team attributions

  42. drylab ·

    3D-Printed Enclosure V1 — Development Window

    The team records the first 3D-printed enclosure development phase.

    Hardware evidence and design files

  43. wetlab ·

    Transformation

    Transformation was performed.

  44. wetlab ·

    Colony picking

    Colonies were picked.

  45. wetlab ·

    Bacterial culture tube change

    Bacterial culture tubes were changed.

  46. wetlab ·

    DNA electrophoresis · Or35a, Or85b, GCaMP6f

    DNA gel with 6 sample lanes for Or35a, Or85b, GCaMP6f.

    Lanes left to right: 1: 1 kb ladder, 2: Or35a_1, 3: Or35a_2, 4: Or85b_1, 5: Or85b_2, 6: GCaMP6f_1, 7: GCaMP6f_2.

    Pixel-identical gel image (WebP) · Results · annotated DNA gels

    The team confirmed undigested plasmids and the same 1 kb ladder in all four gels; the ladder brand and product are unavailable. Paired sample lanes share one construct label in the Results figure.

  47. wetlab ·

    Colony picking

    Colonies were picked.

  48. hp ·

    Challenge Bioproducts interview

    The team separated a VOC screening signal from a food-safety verdict and added confirmatory follow-up to the intended workflow.

    IHP · industry interview

  49. drylab ·

    PCB Layout and Vendor Fabrication — Reported Window

    The timeline records vendor PCB layout and fabrication work from 12 September to 6 October.

    Hardware evidence and design files

  50. hp ·

    Analytical-instrumentation interview

    Feedback positioned AeroSense as a fast on-site screening layer before laboratory confirmation, not a replacement for GC–MS.

    Preserve confirmatory testing in the proposed decision path.

    IHP · analytical interview

  51. wetlab ·

    DNA electrophoresis · Or22a, Or59b

    DNA gel with 4 sample lanes for Or22a, Or59b.

    Lanes left to right: 1: 1 kb ladder, 2: Or22a_1, 3: Or22a_2, 4: Or59b_1, 5: Or59b_2.

    Pixel-identical gel image (WebP) · Results · annotated DNA gels

    The team confirmed undigested plasmids and the same 1 kb ladder in all four gels; the ladder brand and product are unavailable. Paired sample lanes share one construct label in the Results figure.

  52. wetlab ·

    TH-GFP acquisition: 696 stacks

    Recorded the 5137;TH preparation with three timed odor presentations.

    The source settings record 18:18:19 and 696 five-plane stacks. TIFF filename timestamps span 0–132.013 s. Team-confirmed odor windows are 20–40, 60–80 and 100–120 s. The original ImageJ raw and corrected ROI exports are retained.

    TH-GFP results · Data availability

  53. drylab ·

    3D-Printed Enclosure V2 — Development Window

    The 26 September–8 October enclosure-development window is confirmed complete.

    Hardware evidence and design files

  54. wetlab ·

    Cell thawing

    Cells were thawed.

  55. wetlab ·

    Transformation

    Transformation was performed.

  56. wetlab ·

    Cell culture

    Cell culture work was performed.

  57. wetlab ·

    Colony picking

    Colonies were picked.

  58. drylab / model · planned ·

    October and November Evaluation Agenda

    Planned continual-learning analysis, SNN drift evaluation, weight quantization tests, and final model packaging decisions.

    Planned: complete full analysis of the two-phase continual-learning experiment; add drift evaluation for the SNN pipeline (train earlier batch, test later) following Vergara et al. (2012); test synaptic weight quantization of learned KC→MBON weights to N bits; depending on October validation results, decide on the final model version, organize results/figures, and prepare a report/paper outline.

    Model · drift robustness · Hardware page

  59. drylab / hardware · planned ·

    System and User Testing

    Planned workflow tests with users not involved in hardware design, after basic electronic/optical validation.

    Planned work: once the electronic and optical measurement chain has passed basic validation, users who were not involved in hardware design will be asked to perform the intended workflow (prepare/insert sensing unit; power on; start measurement; interpret QC; identify invalid measurement; export; shut down/charge). Record task success, completion time, errors, help required, user comments, and resulting design changes.

    Pending output: User feedback linked to specific design changes

  60. drylab / hardware · planned ·

    Weak-Signal Validation

    Planned dark-noise, leakage, calibration, FDM, crosstalk, SNR, and biological fluorescence measurements.

    Planned tests: (1) Dark-noise measurement; (2) Excitation-leakage measurement; (3) Standard fluorescence calibration; (4) FDM frequency recovery; (5) Channel-crosstalk matrix; (6) Raw vs DLIA SNR; (7) Biological fluorescence measurement. The planned validation ladder and corresponding metrics are already defined in the hardware design report.

    Pending output: Dark trace · Calibration curve · FFT spectrum · Crosstalk heatmap · SNR comparison · Biological comparison

    Engineering · Validation ladder · Experiments · EXP-AS-08

  61. wetlab · planned ·

    Expression Validation

    Planned microscopy, anti-His blot, ionomycin, and 50 µM VUAA1 chain tests, including IRES vs fusion comparison.

    Planned tests: (1) Fluorescence microscopy — mCherry and GCaMP6f baseline; (2) Anti-His western blot — full-length Orco–GCaMP6f fusion at ≈ 105 kDa; (3) Ionomycin — isolates the reporter; (4) VUAA1, 50 µM — tests the whole chain. Acceptance criterion defined in advance: a VUAA1-evoked ΔF/F₀ large enough to quantify on the plate reader, clearly separated from vehicle, and abolished in Ca²⁺-free buffer.

    Pending output: VUAA1-evoked ΔF/F₀ for Orco–IRES–GCaMP6 versus GCaMP6f–(GGGGS)₃–Orco on the same plate under identical conditions

    Record provenance: Original broad protocol/planning record retained. The 12 October team update adds dated execution sessions separately; those sessions do not confirm every reagent, dose, method or validation step in this older proposal.

    Experiments · EXP-AS-03 · Experiments · EXP-AS-04 · Notebook slot nb-EXP-AS-04

  62. wetlab · planned ·

    Calcium Imaging — VOC Panel

    Planned 384-well VOC panel with VUAA1 normalisation across nine receptors.

    Planned work: 384-well plates, 12,000–18,000 cells/well seeded 48–72 h ahead; two-round injection (7 µL vehicle, then 9 µL of 4× VOC); ex 485 / em 535 nm; VOCs at 1, 10 and 100 µM; 50 µM VUAA1 on every plate for normalisation; each VOC–OR pair measured on at least three separate days.

    Pending output: Dose–response curves · Response matrix: nine receptors × VOC panel · Ca²⁺-free specificity control

    Record provenance: Original broad protocol/planning record retained. The 12 October team update adds dated execution sessions separately; those sessions do not confirm every reagent, dose, method or validation step in this older proposal.

    Experiments · EXP-AS-05

  63. wetlab ·

    Cell culture

    Cell culture work was performed.

  64. wetlab ·

    Freeze and change bacterial culture tubes

    Bacterial culture tubes were frozen and changed.

  65. wetlab ·

    Plasmid miniprep and DNA electrophoresis

    DNA gel with 10 sample lanes for Or7a, Or67a, Or19a, Or42a, Or98a.

    Lanes left to right: 1: 1 kb ladder, 2: Or7a_1, 3: Or7a_2, 4: Or67a_1, 5: Or67a_2, 6: Or19a_1, 7: Or19a_2, 8: Or42a_1, 9: Or42a_2, 10: Or98a_1, 11: Or98a_2, 12: 1 kb ladder.

    Pixel-identical gel image (WebP) · Results · annotated DNA gels

    The team confirmed undigested plasmids and the same 1 kb ladder in all four gels; the ladder brand and product are unavailable. Paired sample lanes share one construct label in the Results figure.

  66. wetlab ·

    Cell thawing and plasmid miniprep

    Cells were thawed and plasmid miniprep was performed.

  67. wetlab ·

    Cell culture

    Cell culture work was performed.

  68. wetlab ·

    Co-transfection attempt — unsuccessful

    Co-transfection was attempted.

    Unsuccessful: the cells were too dense and grew poorly, as reported by the team.

  69. wetlab ·

    Cell seeding

    Cells were seeded.

  70. drylab ·

    PCB Soldering and User-Interface Design

    PCB soldering and UI design from 7–10 October are confirmed complete.

    Hardware evidence and design files

  71. wetlab ·

    Co-transfection

    Co-transfection was performed.

  72. drylab ·

    Hardware assembly, trial use and revisions

    Hardware assembly, trial use and revisions from 9–16 October are confirmed complete.

    Hardware · current design and evidence

  73. wetlab ·

    Cell culture

    Cell culture work was performed.

  74. wetlab ·

    DAPI fluorescence session

    DAPI fluorescence work was performed.

    Archived microscopy provenance (date unresolved)

  75. wetlab ·

    P2 kinetic fluorescence pilot — before G418 selection

    Acquired 32 instrument runs and 3,840 fluorescence readings across one 96-well HEK293 plate, approximately 72 h after transfection and before G418 selection.

    A11 reached an 11.86% excursion above baseline; the buffer-only Or35a + ORCO well reached 35.25%. Gain mismatch excluded 24 corrected metrics.

    Results · acquired P2 pilot · Executed 96-well method · Data availability

  76. wetlab ·

    Start G418 selection

    Initiated G418 selection on 11 October.

    Experiments · selection protocol · Post-selection odor record

  77. drylab ·

    User-interface review and adjustment

    UI review and adjustment from 12–14 October are confirmed complete.

    Hardware · current design and evidence

  78. wetlab ·

    Medium change with G418

    The 13 October medium change with G418 is confirmed complete.

  79. drylab ·

    Sodium fluorescein performance testing

    Sodium fluorescein performance testing on 15–16 October is confirmed complete.

    Hardware · current design and evidence

  80. wetlab ·

    Medium change with G418

    The 15 October medium change with G418 is confirmed complete.

  81. wetlab ·

    GH146-GCaMP6f: three serial recordings

    Acquired runs 02, 03 and 04 from the same female fly.

    Instrument start times are 18:15:25, 18:19:49 and 18:24:30. Each run contains 696 five-plane stacks over approximately 132 s. Runs 02 and 03 share one three-odor sequence; run 04 uses a four-odor sequence. The Results analysis and linked raw measurements cover runs 03 and 04.

    GH146-GCaMP6f results · Data availability · Fly imaging methods

  82. drylab ·

    Prepare co-transfected HEK293 cells

    Preparation of co-transfected HEK293 cells for hardware testing on 17 October is confirmed complete.

    Hardware · current design and evidence

  83. wetlab ·

    Transfer culture to a 96-well plate

    Transfer to a 96-well culture plate on 17 October is confirmed complete.

  84. drylab ·

    Hardware testing with cells

    Hardware testing with cells on 18 October is confirmed complete.

    Hardware · current design and evidence

  85. wetlab ·

    Odor test after G418 selection

    Odor testing after G418 selection on 19 October is confirmed complete.

    Experiments · post-selection protocol

  86. team · · Planned

    Jeffrey’s birthday!!!

    Happy birthday, Jeffrey!

  87. wetlab ·

    WL-CLONE-01 · Colony plate photographs

    Three plate photographs preserve colony growth and marked candidates.

    Results · WL-CLONE-01 · Experimental methods · Data availability

  88. wetlab ·

    WL-MIC-01 · Pre-selection endpoint microscopy

    Acquired 25 fields across 12 conditions at 44–48 h after transfection, before G418 selection.

    Segmentation retained 2,624 eligible DAPI objects.

    Results · WL-MIC-01 · Experimental methods · Data availability

  89. wetlab ·

    WL-MIC-01 · Fixation and DAPI labeling

    Team-confirmed preparation: 2% PFA fixation, no permeabilization, followed by DAPI.

    Results · WL-MIC-01 · Experimental methods · Data availability

  90. wetlab ·

    WL-MIC-01 · HEK293 transfection evidence

    Transfected HEK293 cultures produced the 25-field endpoint dataset.

    Evidence is the endpoint image dataset. Neither the earlier electroporation specification nor the Lipofectamine/P 3000 workbook is assigned to this batch without an operator record.

    Results · WL-MIC-01 · Experimental methods · Data availability

Official competition dates
  1. Registration opens

    PIs can start the team application.

    Official iGEM calendar

  2. Early registration deadline

    Early program-fee rate ends.

    Official iGEM calendar

  3. Regular registration deadline

    Regular program-fee rate ends.

    Official iGEM calendar

  4. Jamboree tickets open

    Event website and ticket sales open.

    Official iGEM calendar

  5. Jamboree program announced

    Official program overview release.

    Official iGEM calendar

  6. Jamboree early ticket deadline

    Special early ticket rate ends.

    Official iGEM calendar

  7. Distribution Kit shipping begins

    Shipping milestone; delivery varies by destination.

    Official iGEM calendar

  8. Final registration deadline

    Stage I requirements and fee are due.

    Official iGEM calendar

  9. Mentorship application deadline

    Optional mentorship application closes.

    Official iGEM calendar

  10. Village and project information due

    Submit village, preliminary title and project description.

    Official iGEM calendar

  11. Project information published

    Village and project information publication.

    Official iGEM calendar

  12. Preliminary safety form due

    Submit the preliminary Project Safety Form.

    Official iGEM calendar

  13. Team finalization deadline

    Complete Stage II; at least one Jamboree ticket is needed for in-person team eligibility.

    Official iGEM calendar

  14. Jamboree regular ticket deadline

    Regular ticket rate ends.

    Official iGEM calendar

  15. Project promotion video due

    Upload the project promotion video.

    Official iGEM calendar

  16. Promotion videos under review

    Official review window for promotion videos.

    Official iGEM calendar

  17. Promotion videos published

    Official publication window for promotion videos.

    Official iGEM calendar

  18. Animal Use Form due

    Conditional requirement. Approval must precede the relevant work.

    Official iGEM calendar

  19. Expo booth safety proposal due

    Required when requesting permission for restricted booth equipment or materials.

    Official iGEM calendar

  20. Live Stage Talk proposals due

    Submit proposals for available live stage slots.

    Official iGEM calendar

  21. Team roster freeze

    Final deadline to add or remove roster members.

    Official iGEM calendar

  22. IDT offer registration closes

    Optional sponsor offer; its cut-off differs from standard deliverable deadlines.

    Official iGEM calendar

  23. Safety Check-In deadline

    Conditional requirement. Approval is needed before work outside the White List.

    Official iGEM calendar

  24. Jamboree assignments announced

    Judging, live talks and booth assignments.

    Official iGEM calendar

  25. Final safety form due

    Complete final safety review and PI submission.

    Official iGEM calendar

  26. Team logo and photo due

    Deadline for inclusion in printed Jamboree materials.

    Official iGEM calendar

  27. GenScript offer closes

    Optional sponsor offer.

    Official iGEM calendar

  28. IDT synthesis orders close

    Optional sponsor offer; its cut-off differs from standard deliverable deadlines.

    Official iGEM calendar

  29. Twist synthesis offer closes

    Optional sponsor offer.

    Official iGEM calendar

  30. Wiki freeze

    Complete the judged wiki content.

    Official iGEM calendar

  31. Attributions form freeze

    Complete and submit project attributions.

    Official iGEM calendar

  32. Judging form freeze

    Complete and submit the judging form.

    Official iGEM calendar

  33. Registry contributions freeze

    Complete parts and documentation intended for evaluation.

    Official iGEM calendar

  34. Software repository freeze

    Complete applicable project software in the dedicated iGEM repository.

    Official iGEM calendar

  35. Presentation video due

    Upload the presentation video.

    Official iGEM calendar

  36. Presentation videos published

    Official presentation-video publication date.

    Official iGEM calendar

  37. Jamboree badge collection opens

    Paris on-site collection date; consult the event program for opening hours.

    Official iGEM calendar

  38. Jamboree Expo Days

    Paris event dates. Consult individual assignments for times.

    Official iGEM calendar

  39. Judging sessions

    In-person and online sessions follow each team's assigned time.

    Official iGEM calendar

  40. Finalists announced

    Official finalist announcement date.

    Official iGEM calendar

  41. Jamboree final show and results

    Final presentations, awards and results publication.

    Official iGEM calendar

  42. Participation certificates available

    Certificates become available to eligible roster members.

    Official iGEM calendar

  43. Judging recordings available

    Recordings become available on team pages.

    Official iGEM calendar

  44. Wiki editing reopens

    Official reopening time for post-Jamboree updates.

    Official iGEM calendar

  45. Wiki final archival

    Final editing deadline before permanent archival.

    Official iGEM calendar

Team timeline

Team milestones

These dates and effort totals are transcribed from our team-entered Attributions form. Calendar weeks describe the span; actual weeks describe time worked. They are separate measures, and are not official iGEM deadlines.

Table 1. Team-reported dates and effort for recruitment, project planning and Wiki work. Wiki completion on 20 October is team-confirmed; calendar duration and actual effort remain separate measures.
ActivityStartEndCalendar weeksActual weeks
Recruit Team Members2026-03-192026-04-0631
Development of Project Plan2026-04-132026-05-1142
Building the Team Wiki2026-09-072026-10-2064

Wiki development ran from 7 September to 20 October, with four actual weeks of work recorded.

Hardware and learning-game phase dates
Table 2. Hardware and learning-game timeline supplied by the team
ActivityStartEndRecord status
Hardware ideation, personnel planning and team formation2026-04-012026-04-21Reported work period
Hardware literature analysis2026-04-222026-05-09Reported work period
Airflow and Optical Simulations2026-05-102026-07-05Reported work period
PCB V1 Design and Planning — Phase Window2026-06-072026-08-02Reported work period
PCB V1 Assessment — Engineering Cycle 1 Phase2026-08-032026-08-28Reported work period
PCB V2 Revision and Design — Engineering Cycle 2 Phase2026-08-292026-09-11Reported work period
PCB Layout and Vendor Fabrication — Reported Window2026-09-122026-10-06Reported work period
3D-Printed Enclosure V1 — Development Window2026-09-082026-09-25Reported work period
3D-Printed Enclosure V2 — Development Window2026-09-262026-10-08Completed
PCB Soldering and User-Interface Design2026-10-072026-10-10Completed
Hardware assembly, trial use and revisions2026-10-092026-10-16Completed
UI review and adjustment2026-10-122026-10-14Completed
Sodium fluorescein performance testing2026-10-152026-10-16Completed
Prepare co-transfected HEK293 cells2026-10-172026-10-17Completed
Hardware testing with cells2026-10-182026-10-18Completed
Learning Game: Ideas and Rules2026-07-132026-07-15Reported work period
Learning Game: Initial Design2026-07-162026-07-30Reported work period
Learning Game: Internal Evaluation and Suggestions2026-07-312026-08-29Reported work period
Learning Game: Updates and Outcomes2026-08-302026-09-15Reported work period
03 · Pivot moments

Turning points

Documented decisions show how tests changed the design, including negative and incomplete evidence.