Abstract

Engineering changed the mammalian expression backbone, reporter architecture, fluorescence reader and decoder evaluation. Sequence review led to pcDNA3.1(+); a weak IRES reporter prompted a GCaMP6f–Orco fusion. Circuit review removed a redundant processor and improved weak-signal protection, while optical and gas models guided the enclosure. Decoder comparisons improved PN encoding and located the learned readout bottleneck. Six receptor-design iterations tested prediction, mutation ranking and molecular access in a separate mosquito reference complex.

Engineering approach

Each cycle links a design question, artifact, evidence and revision, distinguishing sequence reviews, qualitative observations, computations and measurements.

The experimental host is HEK293. Assay procedures are documented in Experiments and image-level evidence in Results. Detailed physical models, decoder methods and receptor-engineering analyses are kept on Model; build files and component choices are on Hardware.

Further reading: [1]

Four technical streams. Evidence before closure.

Engineering at a glance

Every redesign starts with a question the previous design could not answer.

Records

Engineering cycles

Each cycle records Design → Build → Test → Learn → Redesign.

Technical workstream

Wet Lab

3 cycles · cloning backbone → weak IRES reporter → fusion

Current artifact: synthesized GCaMP6f–Orco fusion and fixed-field images

Experimental host: all team wet-lab experiments use HEK293.

Wet Lab Wet Lab

Cycle 1 Establishing a transcription-competent vector

Evidence status REVIEW-SUPPORTED

Before testing receptor function, can the delivered DNA support mammalian expression?

Sequence review; vector redesign completed

Construct backbone — before / after

Showing Before · cloning backbone

ColE1 ori
bla
adapters
Insert CDS
No mammalian promoter
No polyA

High-copy cloning backbone

Propagates in bacteria. Cannot support the intended mammalian transcription.

CMV
Insert CDS
BGH polyA
NeoR

pcDNA3.1(+)

CMV promoter + BGH polyadenylation + NeoR (G418). All ten constructs consolidated here.

Transferable lesson

Verify that every host-required expression element exists before ordering / synthesis — not after delivery. Written up for other teams on Contribution.

Design

We initially treated the supplied high-copy cloning plasmid as a HEK293 expression vector.

Sequence review checked whether the backbone supplied the host’s required regulatory elements.

Build

The synthesized DNA arrived in a cloning backbone that could be amplified in E. coli; it did not establish a mammalian expression system.

The complete plasmid sequence and annotation were the review artifacts.

Test

Test evidence: Construct / expression-context review; primary record incomplete.

The backbone contained a ColE1 origin, β-lactamase resistance and sequencing adapters, but no mammalian promoter or polyadenylation signal.

Learn

We considered overlap-extension PCR of a linear CMV–insert–poly(A) cassette, then chose a mammalian vector.

A common vector provided the panel with a shared expression and selection context.

Redesign

We consolidated all ten constructs onto pcDNA3.1(+), supplying a CMV promoter, BGH polyadenylation signal and NeoR cassette for G418 selection.

Cycle 2 records the bicistronic reporter response. Construct details: Design.

Key decision

Consolidated the panel onto pcDNA3.1(+) for mammalian expression.

Related figure(s)

Diagnostic logic

Ionomycin × VUAA1 matrix

Cycle 2 taught that “no signal” is not one failure. Two independent controls separate reporter vs channel: ionomycin (Ca²⁺ ionophore — bypasses the channel) and VUAA1 (Orco agonist — full chain).

Select a pattern

Pattern: both respond

Interpretation

Fully functional pathway (working hypothesis): reporter and channel both respond under these controls.

Interpretation

Sensor fine; channel not: investigate OR/Orco folding or trafficking.

Interpretation

Sensor not functional: investigate expression and construct integrity.

Static reference — not a live assay. Implementation status of ionomycin in the SOP: Experiments.

Engineering summary

What we built. What changed.

Work. We checked the mammalian expression backbone, investigated the weak IRES reporter, and redesigned the sensing construct as a GCaMP6f–Orco fusion.

Outcome. All constructs use pcDNA3.1(+); BBa_26E11Z80 was synthesized. The ionomycin × VUAA1 scheme distinguishes reporter and channel responses.

Construct compatibility decision

Internal BsaI/SapI/PstI sites were retained so the Registry sequence matches the synthesized material. View the compatibility tables →

Further reading: [7]

Dry Lab

Dry Lab · Hardware

6 cycles · electronics, integration, simulation, documentation and bench testing

A lower-gain retest redirects the board diagnosis

Dry Lab Hardware

Cycle 1 From a Complete Circuit to a Measurable Circuit

Evidence status REVIEW-SUPPORTED

Would the first circuit preserve a weak photodiode signal through to digitization?

Electrical design audit and professional review

Conceptual pivot

Before

“Amplify the fluorescence as much as possible”

After

“Preserve measurement integrity throughout the entire analog and optical chain.”

Hardware V1 → V2 (measurement integrity)

Showing Before · V1

Gain-first V1

  • 100 MΩ TIA emphasis for maximum amplification
  • Longer high-impedance PD/TIA routing risk
  • Shared analog/digital supply priorities
  • Stopped before fab after DRC/ERC + review

Integrity-first V2

  • Shorter PD–LMP7721 path + guarded region
  • ADS8866 symbol rebuilt; 3-wire CS + damping
  • Separate 3V3_ANA / 3V3_DIG rails
  • Improved decoupling and return-current management
Design

V1 combined LED excitation, a sample, photodiode, LMP7721 TIA, ADS8866 ADC and ESP32. The four-layer board included 100 MΩ feedback, four LED channels, power regulation and a Raspberry Pi interface.

The review examined whether layout, supplies and the ADC interface preserved the signal at this gain.

Build

V1 included a schematic, PCB layout, BOM, footprints, 3D models and DRC/ERC reports. The board was not fabricated.

The team prepared the design; iST Group reviewed the high-impedance detector region and mixed-signal interfaces.

Test

Test evidence: Archived computational DRC / ERC audit.

The V1 archive recorded 73 DRC violations, four unconnected items, seven ERC errors and 11 ERC warnings, covering clearance, solder mask, incomplete nets, guards, power rules and symbol/footprint consistency. V1 was not fabrication-ready.

Professional review covered LMP7721 pins and guarding, photodiode pads, TIA placement, ADS8866/reference decoupling, SAR input behavior, ESP32 EN/BOOT and critical capacitors.

Learn

At 100 MΩ, leakage from long traces, poor guarding, humidity or flux residue can rival photocurrent. More ADC resolution cannot recover a corrupted analog signal.

The ADC symbol also required correction against its datasheet. The design objective shifted from gain alone to control of optical and electrical interference.

Redesign

V2 shortens the photodiode–LMP7721 high-impedance path and adds guarding around the detector/TIA feedback region. The ADC symbol was rebuilt from the ADS8866 pinout; the design uses the intended three-wire CS arrangement with DIN high and damping on SCLK/CONVST. Analog and digital 3.3 V supplies, decoupling and return-current paths were separated or reorganized.

Cycle 2 then reviewed the need for a second processor.

Key decision

Stop V1 before fab; treat DRC/ERC plus professional review as the cycle’s Test evidence; redesign V2 around measurement integrity rather than maximum gain.

Related figure(s)
PRIMARY EVIDENCE TEAM ARCHIVE

V1 KiCad PDF export

First and only page of the archived V1 KiCad PDF, showing the ESP32 controller, LED drivers and analog readout circuit Open V1 schematic PDF

hardware information/pcb v1/final.pdf

Figure 2.

Figure E-H1A

V1 circuit schematic archive

Inspected / tested Archived V1 fluorescence-reader circuit schematic.

What you are seeing Preview of the archived single-page KiCad PDF; overlapping labels belong to the original export.

Version V1 archive (pre–August 2 redesign stop)

Supports That a concrete V1 circuit schematic was archived before the Cycle 1 stop decision.

Does not prove PCB routing geometry, physical fabrication, optical performance, or post-assembly electrical measurements (V1 was not manufactured).

Source Team archive — KiCad PDF export.

PRIMARY EVIDENCE TEAM ARCHIVE
** Drc report for final.kicad_pcb **
** Found 73 DRC violations **
…
** Found 4 unconnected pads **

ERC report (Encoding UTF8)
 ** ERC messages: 18  Errors 7  Warnings 11
Figure 3.

Figure E-H1B

KiCad DRC/ERC reports (August 2 archive)

Inspected / tested Electrical design-rule and electrical-rule checks on the V1 PCB/schematic archive.

What you are seeing Verbatim summary lines from the team’s KiCad report files (not a GUI screenshot; the GUI capture was not archived).

Version V1

Supports The stop-before-fab decision: 73 DRC violations, 4 unconnected pads, 7 ERC errors, 11 ERC warnings.

Does not prove Root-cause ranking of each violation, or that every listed item would have failed on a fabricated board.

Source Team archive — PCB layout/DRC.rpt and ERC.rpt (copied into wiki fig/engineering).

PRIMARY EVIDENCE TEAM ARCHIVE

V1 — schematic and board archive

Data availability

Data availability

V2 — KiCad 3D top

KiCad 3D render of AeroSense V2 PCB top side
Figure 4.

Figure E-H1D

V1 design archive and V2 KiCad 3D render

Inspected / tested Archived V1 layout package versus archived V2 board 3D view (design artifacts).

What you are seeing Archived V1 schematic and editable board source alongside the V2 top-side 3D render.

Version V1 pre-stop archive · V2 layout render (wiki fig/hardware)

Supports The V2 layout revision following the V1 review.

Does not prove Measured V2-versus-V1 performance; V1 was not fabricated.

Source Team archive — V1 PDF; V2 PNG identical to PCB layout/3D_top.png.

Engineering summary

What we built. What changed.

Work. The student team specified the sensing requirements, selected the core components, and prepared the initial schematic, BOM and PCB layout. iST Group supplied professional schematic/layout review and manufacturing-preparation support.

Outcome. The review informed photodiode/TIA routing, separate analog/digital supplies and the verification specification. Follow-up board tests and iST assessment →

Further reading: [9]

Dry Lab

Dry Lab · Odor decoding

3 cycles · quantile coding → layerwise diagnosis → receptor-data transfer

Current state: computational comparisons identify the readout and data-collection priorities.

Cycle 1 Put PN resolution where the data are

Can the network learn gas identity without losing it during encoding?

Computational comparison

Design

We hypothesized that fixed sparse expansion followed by a learned readout could classify gas-response patterns, but first needed to check whether the PN representation retained the input information.

Build

We standardized the 128 UCI-270 features, fitted PCA on training data and converted each component to a PN-bin code. We compared equal-width and training-quantile bin edges.

Test

On the second principal component, three of twenty equal-width bins contained 90% of the training measurements and eight bins were empty. A linear SVM on the PN code scored macro-F1 0.77 with twenty equal-width bins, 0.93 with sixty-five equal-width bins and 0.98 with twenty quantile bins. This PN-code comparison uses five-fold cross-validation over 13,910 measurements; it is separate from the SNN learning-curve split.

Learn

Uniform coverage of a wide numerical range wastes PN resolution on sparse tails. The encoding should follow sample density.

Improve

We adopted quantile bins and exposed connection probability, APL inhibition, threshold adaptation, learning rate, weight cap and MBON inhibition as configurable settings. The reported SNN run peaks at 0.83, falls to 0.53 at cycle 400 and ends at 0.79; tuning did not remove training instability. See the full learning curve.

Equal-width and quantile PN encoding on UCI-270
Figure 1. Equal-width and quantile PN encoding on UCI-270. The two projections show 11,128 training measurements; the readout bars use all 13,910 measurements in five-fold cross-validation. Bars are means and lines are the source-reported fold spread. These are linear PN-code readouts, not SNN scores.

What changed

We changed the PN code to follow training-data density, added measurement-grouped layerwise probes, and adapted the code to a small receptor dataset. The new evidence supports a specific next step—readout comparison and replicated biological input—not a completed cell-based odor classifier. Methods, uncertainty and source availability.

Earlier preprocessing and precision-audit cycles

This earlier record is retained for its data-cleaning, seed and clock-audit evidence. Its scores and fixed-seed candidates do not describe the newer UCI/DoOR configurations above.

Dry Lab

Dry Lab · Odor decoding

2 cycles · multi-seed discipline → gated OFAT candidate

Current state: baseline retained; clock error corrected

Dry Lab Model

Cycle 1 Data integrity, multi-seed discipline, and an unstandardized-PCA artifact

Evidence status DATA

Are the apparent performance and sensor-importance patterns robust to data cleaning and random seed?

Recorded seed comparison and preprocessing audit

  1. 1Data cleaning105 contaminated Batch2 files isolated
  2. 2Multi-seed checkseeds 100 / 102 / 104
  3. 3Sensor contradictionSVM vs SNN / ANOVA-F
  4. 4Root causeno StandardScaler on SNN PCA
  5. 5Redesignmulti-seed rule + queued scaler

Team-reported runs; primary plot unavailable (Evidence note E-D1)

Single-seed (misleading)

~0.90

Appeared strong at one seed — treated as luck, not a claim.

Honest 3-seed mean

~0.85

Average across the three recorded seeds.

pca_dim=5 more stable across seeds than pca_dim=3 (best-per-seed std 0.042 vs 0.080); pca_dim=8 saturated at the same level as 5. Cleaning barely shifted PCA (top-3 variance 88.0%→88.7%). Primary multi-seed plot: Evidence note E-D1 (not archived — text-reported only).

Sensor-importance contradiction Evidence note E-D2

Standardized SVM

Dropping S6 improved F1 by +0.041.

SNN (unstandardized PCA→bin)

Barely changed when S6 dropped. LOSO ranked S13 most / S6 least important.

ANOVA-F separability

Flagged S2 / S9 / S11 as truly discriminative — conflicting ranking.

Root cause: SNN PCA never applies StandardScaler, so apparent importance can track raw sensor magnitude (S13 large, S6 small), not true separability.

Design

The decoder uses a fly-inspired PN → KC → MBON pathway, implemented in Brian2 [10], on the external KT Batch 1–3 gas-sensor benchmark. Before tuning it further, we asked whether contaminated inputs, stochastic initialization or preprocessing differences were driving the apparent results.

The external benchmark contains metal-oxide sensor recordings, not AeroSense reader output.

Build

We isolated 105 contaminated Batch 2 files—53 from dev1 and 52 from dev2—and added the default-on -drop-contaminated option. Batch 2 went from 255 to 150 included files while preserving the excluded raw records.

Runs compared seeds 100, 102 and 104, PCA dimensions 3, 5 and 8, and sensor-S6 removal. SVM used standardized PCA; SNN retained its PCA-to-bin preprocessing.

Test

Test evidence: Team-reported runs and preprocessing audit; primary artifacts incomplete.

Cleaning changed the top-three PCA variance fraction only slightly, from 88.0% to 88.7%. A single-seed F1 near 0.90 fell closer to 0.85 when summarized across three seeds, and five PCA dimensions were more stable than three in the recorded runs.

Removing S6 improved the standardized SVM by 0.041 F1, while SNN changed little. Leave-one-sensor-out and ANOVA-F rankings also disagreed, exposing the preprocessing mismatch.

Learn

Inspection found that the SNN PCA path lacked StandardScaler. Raw feature magnitude could therefore dominate the projection.

Seed variation and preprocessing differences made a single best score or sensor ranking unreliable.

Redesign

We adopted across-seed reporting and identified the missing SNN standardization step.

Cycle 2 audits numerical precision and weight selection. Methods and records: Model.

Key decision

Adopted multi-seed reporting and flagged the SNN scaling mismatch.

Related figure(s)

Engineering summary

What we built. What changed.

Work. We audited preprocessing, compared seed-dependent model results, and investigated the quantization clock mismatch before evaluating parameter-sweep candidates.

Outcome. The clock error was corrected and affected precision conclusions withdrawn. The baseline remains 0.8676; the fixed-seed 0.8870 candidate is separate.

Dry Lab

Computational receptor engineering

Six receptor design iterations

Six computational iterations connect response prediction, mutation audits and membrane simulations. Or22a and Or35a remain functional candidates; no engineered receptor demonstrated improved sensitivity or selectivity.

Complete receptor models, 36 figure groups and downloadable data →

Cycle 1 Turn odor-response data into design candidates

Design

Curate a benchmark of 24 Drosophila receptors and 110 odorants from published measurements. Compare a project-defined panel of mold-related volatiles with control odorants; these compounds are not assumed to be unique markers of mold. (Hallem & Carlson, 2006)

Build

Combine molecular descriptors, receptor sequences and AlphaFold-derived structural features in matched prediction models. Generate Or22a (Hallem & Carlson, 2006) / Or35a point-mutation models with ColabFold and dock target and control odorants. The build consists of computational sequences and structures. (Jumper et al., 2021; Mirdita et al., 2022)

Test

For receptors excluded from training, R² increased from 0.1125 with ligand features to 0.2325 with sequence features. The full representation reached 0.2356; its additional gain had an uncertainty interval spanning zero. An initial docking (Trott & Olson, 2010) screen suggested small relative preference shifts for F34Y and E196Q.

Learn

Prediction prioritized candidates; docking differences did not establish selectivity. R² measures predictive fit.

Redesign

Move from ranking candidates to checking whether the proposed mutations actually contact the odorant and whether their ranking survives changes in docking setup.

Comparison specification: small ligand displacements, local relaxation and no-pull controls. The 24 related conformations and 70 ns trajectories yielded no validated pathway. Read the comparison design →

Beyond the bench · Business development

Entrepreneurship

Define the first use

Six rounds of external feedback changed the first application, buyer, sampling site and field-trial requirements.

Entrepreneurship

Cycle 1Medical device → agricultural screening

SynBioBeta review

Design

The SynBioBeta poster listed medical point-of-care testing next to agriculture; more applications seemed more valuable.

Build

SynBioBeta in San Jose: Next-Gen BioLeader and Expo Hall poster, reporting target metrics only.

Test

Investors and founders asked whether living cells can scale, how a medical device would be regulated, and whether the hardware has enough margin. A UCLA PhD student had not understood how a live-cell sensor is built.

Learn

A long application list hides very different paths to market; a diagnostic device faces a far heavier approval path.

Redesign

First application moved from medical to agriculture; medical kept as a long-term lead. The scale question is still open.

Financial assumptions behind the redesign

The planning workbook exposes adoption-volume, pricing, staffing and funding assumptions through four sheets: Expense Forecast, Burn Rate Forecast, 3-Year P&L and Equity Plan. These are scenarios, not secured orders or financing; all three years project operating losses.

The sheets are not yet reconciled: first-year expenses are NTD 3,076,500 in Expense Forecast versus NTD 4,200,000 OPEX in the P&L, while Burn Rate Forecast assumes zero revenue versus NTD 504,000 in the first-year P&L.

Financial planning preview — PDF · Read the financial assumptions →

Engineering summary

What we built. What changed.

Work. SynBioBeta, FITI, industry, agricultural and patent consultations challenged the use case, buyer, sampling location and route to deployment.

Outcome. The plan now prioritizes agricultural screening, institutional buyers and laboratory confirmation, with field targets and IP steps recorded as proposals. Read the market and deployment rationale →

Feedback reached the bench. A biotechnology interview separated a mold-associated VOC signal from a toxin or food-safety verdict. Detectability × Consequence × Unmet Need × Willingness to Pay became a target-selection rule, including for the Or49b/indole path. Read the claim-boundary decision →

Further reading: [11]

Beyond the bench · Learning design

Education

Teach through decisions

A 300-response survey informed the games and five-module curriculum. Classroom and workshop feedback then identified what learners needed explained more clearly.

Education

Cycle 1General mold awareness → decisions about invisible risk

Survey · 300 respondents

Design

The public broadly misunderstands mold, so education should correct that gap.

Build

Bilingual online survey, 300 respondents; its misconception items served as a diagnostic pre-test.

Test

Understanding fell as risk became less visible: 78% (removing visible mold is not enough), 64% (heat does not destroy all mycotoxins), 58% (normal look and smell is not safe), with about 15% holding the misconception on the last. Higher-knowledge respondents (n = 180) recorded the opening date more often than the rest (n = 120): 42% vs 25%. Even so, 58% of them did not. Top needs from a screening tool: trustworthy results 76%, avoiding missed risk 73%, clear next steps 68%.

Learn

We interpreted the gap as a decision habit about invisible risks, not only missing facts. The self-selected sample guided teaching priorities; it does not estimate how common these beliefs are in the population.

Redesign

We chose two teaching targets: heating is not a guarantee of mycotoxin removal, and appearance and smell are not safety checks. The format changed from a talk to a decision-based game.

Engineering summary

What we built. What changed.

Work. The survey identified two teaching priorities, leading to Odor Pixel Suite, the five-module Learning Lab and live teaching activities.

Outcome. The resources connect biology to decisions. Qualitative feedback led to clearer explanations and a Teacher Toolkit; reach and self-reports remain distinct from measured learning. Read the activities, feedback and resources →

Designing the reading experience

Wiki design

Contextual reading support

A shared dictionary explains terms; search finds a destination; the fly connects a question to the section behind it.

Two interface-design cycles refined the wiki’s help tools through review and reader feedback.

Wiki DesignInformation architecture

Cycle 1Three tools, three reading needs

Does each help tool make the reader’s next action clear?

Interface review; navigation roles revised

Design

Readers need three kinds of help: understanding a term, finding a destination and interpreting a claim.

The tools were designed to support these tasks within the reading flow.

Build

Project Search indexes titles, keywords and excerpts. A shared glossary supplies dictionary and in-text definitions; Ask the Fly links questions to explanations.

Test

Test evidence: Supporting design / feedback record; not technical validation.

Page review found overlapping tool roles and interruptions when readers left a passage to look up a term.

This was an interface review, not a measured usability study.

Learn

Definitions belong beside terms, search results lead to pages, and contextual questions explain the current claim.

Redesign

We assigned these roles to in-text definitions, Glossary, Project Search and Ask the Fly.

Design summary

What we built. What changed.

Work. We separated the jobs of glossary, search and contextual questions, then organized recurring reader questions by page and section.

Outcome. Readers can look up a term in place, navigate to a topic, or follow a team-written answer back to its explanation. Ask the Fly uses a curated local question bank; it does not generate answers or upload visitor questions.

Across tracks

Change log

Hardware decisions from V1 to V2. Dated records: Notebook.

Table 3. Hardware revisions and their recorded rationale.
Version What changed Why Evidence / link
V1 Stopped V1 fabrication; opened professional review and a V2 path Layout was not fabrication-ready V1 DRC/ERC archive · Hardware Cycle 1
V1 review Guarding and a shorter high-impedance summing node Gain alone cannot guarantee sensitivity 100 MΩ leakage risk · Hardware Cycle 1
V1 review Input isolation / filter network at the ADC A SAR ADC can disturb the analog source Expected ADC interaction · Hardware Cycle 1
V1 review Emission filtering and baffling The photodiode can also see excitation leakage Broad PD spectral sensitivity · Hardware Cycle 1
V1 review Rebuilt ADS8866 symbol from the 10-pin datasheet pinout CAD library symbols are not datasheet truth Incorrect ADC symbol · Hardware Cycle 1
V2 ESP32-standalone architecture; Raspberry Pi removed from the portable reader Extra compute did not add a unique measurement function Function mapping · Hardware Cycle 2
V2 Rechargeable power architecture (design decision) RPi-derived 5 V was incompatible with portable standalone use Power concept · Hardware Cycle 2
V2 layout Shortened IN− path and guarded PD/TIA region Leakage control requires physical placement, not only a schematic High-impedance path · Hardware Cycle 3
V2 Separate 3V3_ANA / 3V3_DIG rails One shared regulator would force a noise/current compromise Supply priority · Hardware Cycle 2

Reflection

Discussion

Table 4. Completed work and evidence limits
StreamRecorded workNot established
BiologySynthesized fusion, sequence checks and fixed-field microscopyFunctional odor sensing or validated reporter improvement
HardwarePCB design, physical assembly, software, optical/gas simulations and board diagnosticsReader sensitivity, stable operating point and repeatable assembly
DecoderPreprocessing audit, seed comparisons and clock correctionPrecision recommendation or promotion of the seed-100 weight candidate
  • Hardware — the datasheet review corrected symbols and the high-impedance layout.
  • Wet lab — host requirements and reporter/channel controls shaped the design (matrix).
  • Dry lab — seed comparisons and preprocessing audits changed the evaluation rules.
  • External evidence sequencing — stakeholder reviews focused the first use case and learning objectives.

The archive contains the V2 design and verification protocol; no V3 revision is documented.

The correspondence records design requests and partner observations, not a measured improvement in noise, standby current or repaired-board performance. The historical split-cap option also lacks seal and biocompatibility validation. The unresolved short cannot be assigned a confirmed root cause from the supplied update.

The DRC report names final.kicad_pcb; the retained editable file is final2.kicad_pcb. The archive does not establish that the report checks that exact saved revision.

Conclusion

The completed iterations changed five decisions: mammalian expression, reporter architecture, weak-signal protection, reader control and model evaluation.

Data availability

Research archive: Zenodo · DOI: 10.5281/zenodo.23469212. Public release pending.

The Notebook provides dated work records. Design and Parts describe the current biological architecture; Hardware links build and simulation documents; Model links decoder methods and records. Wet-lab measurements and sample-level analysis are on Results.

Human Practices cycle source: Human Practices decisions and interviews.

Technical engineering evidence

The public guide brings together the reviewed power change, historical CAD geometry and unresolved TIA diagnostic. Original correspondence remains private; the technical summary omits contact and invoice details.

Illustrated engineering evidence guide · PDF

Financial planning workbook

Financial planning preview — PDF

The financial planning preview is linked above; the editable workbook is retained in the research archive.

Published code and documents

Historical budget documents

The formula-based development budget and its price-source/calculation record are retained separately from the published material-price workbook.

Raw and complete data

Archive availability: Research archive availability.

Complete computational outputs and experimental source files remain in the research archive. The dated engineering narrative and measured results remain available in the Notebook and Results pages.

Data availability · Task-based feedback form

References

Research papers
  1. iGEM · 2026 Project Awards and Judging Criteria — Engineering principles and iterative engineering. Official medal criteria ↗
    Source highlights
    • Official judging context for describing engineering iteration and its evidence.
  2. Jones, P. L., Pask, G. M., Rinker, D. C., & Zwiebel, L. J. (2011). Functional agonism of insect odorant receptor ion channels. Proceedings of the National Academy of Sciences, 108(21), 8821–8825. DOI: 10.1073/pnas.1102425108.
    Source highlights
    • Reports functional agonism of insect odorant receptor ion channels.
    • Supports VUAA1 as an Orco-family agonist useful for functional controls.
  3. Ibrahimi, A., et al. (2009). Highly efficient multicistronic lentiviral vectors with peptide 2A sequences. Human Gene Therapy, 20(8), 845–860. DOI: 10.1089/hum.2008.188.
    Source highlights
    • Characterizes multicistronic lentiviral vectors using 2A peptides and related co-expression strategies.
    • Literature context for IRES / multicistronic reporter expression trade-offs.
  4. Chen, T.-W., et al. (2013). Ultrasensitive fluorescent proteins for imaging neuronal activity. Nature, 499(7458), 295–300. DOI: 10.1038/nature12354.
    Source highlights
    • Introduces ultrasensitive GCaMP6 fluorescent calcium indicators for imaging activity.
    • Supports calcium / fluorescence reporting as an optical readout modality (contextual literature).
  5. Benton, R., Sachse, S., Michnick, S. W., & Vosshall, L. B. (2006). Atypical membrane topology and heteromeric function of Drosophila odorant receptors in vivo. PLoS Biology, 4(2), e20. DOI: 10.1371/journal.pbio.0040020.
    Source highlights
    • Demonstrates atypical membrane topology and heteromeric OR–Orco function in vivo.
    • Topology evidence used when placing reporters relative to Orco termini.
  6. Butterwick, J. A., et al. (2018). Cryo-EM structure of the insect olfactory receptor Orco. Nature, 560(7719), 447–452. DOI: 10.1038/s41586-018-0420-8.
    Source highlights
    • Cryo-EM structure of the insect olfactory co-receptor Orco.
    • Structural context for the Orco channel in design discussions.
  7. Zboray, K., et al. (2023). High-throughput ligand profile characterization in novel cell lines expressing seven heterologous insect olfactory receptors for the detection of volatile plant biomarkers. Scientific Reports, 13, 21757. DOI: 10.1038/s41598-023-47455-4.
    Source highlights
    • Heterologous insect olfactory receptors expressed in mammalian cell lines for odorant / volatile profiling.
    • Demonstrates a living-cell sensor route for plant-related VOC biomarker detection (literature context, not AeroSense data).
  8. Espressif · ESP32-WROOM-32E / ESP32-WROOM-32UE Datasheet. Manufacturer datasheet ↗
    Source highlights
    • Espressif · ESP32-WROOM-32E / ESP32-WROOM-32UE Datasheet. Manufacturer datasheet ↗
  9. Texas Instruments · LMP7721 datasheet (opens in a new tab) — 3-Femtoampere Input Bias Current Precision Amplifier, Rev. E.
    Source highlights
    • Texas Instruments · LMP7721 datasheet ↗ (opens in a new tab) — 3-Femtoampere Input Bias Current Precision Amplifier, Rev. E.
  10. Stimberg, M., Brette, R., & Goodman, D. F. (2019). Brian 2, an intuitive and efficient neural simulator. eLife, 8, e47314. DOI: 10.7554/eLife.47314.
    Source highlights
    • Brian 2 simulator for spiking neural networks.
    • Software context for the Dry Lab / Model Brian2 experiments.
  11. iGEM · 2026 Project Awards and Judging Criteria — Integrated Human Practices, Entrepreneurship, and Education. Official special-award criteria ↗
    Source highlights
    • Official judging context for integrated Human Practices, Education and Entrepreneurship.
  12. Texas Instruments · ADS8866 16-bit, 100-kSPS SAR ADC — Datasheet, Rev. C. Manufacturer datasheet ↗
    Source highlights
    • Texas Instruments · ADS8866 16-bit, 100-kSPS SAR ADC — Datasheet, Rev. C. Manufacturer datasheet ↗
Datasheets iGEM resources

Further reading: [12]

On this page
Back to top